
This was a project for a new city in Kuwait, covering 731,000 square meters
with an estimated total cost of $410m. The project included 545,000 square
meters of water-front plots, 106,000 square meters of back-bay plots and
80,000 square meters of commercial plots. The designers were Wimberley
Allison tong and goo. The entire project from conception to final delivery
was produced in 10 weeks.. This included a live shoot as well as purchased
footage. The final edit was produced by Lydia Baker at Blink TV.
The Flash media on this page requires version 8 of the Adobe Flash Player which is downloadable for free from Adobe.
< back
Contact: adam@invisiblecities.co.uk Tel: 01243 370 547 Fax: 01243 370 547
InvisibleCities, Unit B5, The Wren Centre, Westbourne Road, Emsworth, PO10 7SU
© 2006 InvisibleCities Limited and respective clients. Disclaimer
![]()